cog

Dahl 521LB-33-33L, 5/8 OD Comp X 5/8 OD Comp Long. Lead free.

$27.79 $39.70
(You save $11.91)
Availability:
Usually Ships Same Day
Manufacturer Part Number:
521LB-33-33L
Warning Warning: Cancer and Reproductive Harm – www.p65warnings.ca.gov
Dahl 521LB-33-33L, 5/8 OD Comp X 5/8 OD Comp Long. Lead free.
Dahl 521LB-33-33L No Solder Valve. 5/8 OD Comp X 5/8 OD Comp Long. Lead free.           

Pattern Straight
Finish Rough Brass
Operation Plated Handle
Inlet Pipe Type Copper
Inlet Size 5/8 OD
Inlet Connection Comp
Outlet Pipe Type Copper
Outlet Size 5/8 OD 
Outlet Connection Comp Long
Brass Lead free